This is a project to build a new factory on the property of an existing factory. The new factory is designed to accommodate the client’s request to increase productivity by improving the work environment. In consideration of heat dissipation from four electric furnaces that melts lead, a 7-meter-high ceiling is secured. The oversized hood that covers the working space is equipped with a rectifier to clear the standard of surface wind speed. Ducts, pipes and fans are placed in the high ceiling. To maintain the brightness in the whole space, extra lighting fixtures are placed in the hood.
SPECS
- Location
- Settsu, Osaka
- Complete
- 2020
- Structure
- Steel structure
- Scale
- 2 storeys