About
will be with you.
AR Architecture Office in Chuo-ku, Osaka, which aims to maximize the value of buildings by carefully reading each context and sublimating the solution into design, while respecting the client's wishes, Since its establishment in 1975, the firm has been involved in the design and supervision of a wide range of projects, including offices, hotels, residences, stores, and sports facilities, regardless of whether they are new buildings or renovations.
Staff

PresidentMasayuki Shimokawa
- 1978
- Born in Nara Prefecture
- 2000
- Graduated from the Department of Architecture, Faculty of Engineering, Osaka Institute of Technology
- 2000-2001
- Worked at Tomotsugu Akutsu Office
- 2001-2006
- Worked at Keiichi Hayashi Architectural Design Office
- 2007-2012
- Worked at AR Design Co., Ltd.
- 2012
- Appointed CEO of AR Design Co., Ltd.
Chairman and Executive DirectorZenji Kawakami
Managing DirectorKazuyo Kawakami
Class-1 Registered ArchitectsEiji Yamamoto
Shinji Kawakami
Minomo Tsuyoshi
Class-2 Registered ArchitectsMizue Nakamura
Zhao Huanhuan
Class-2 Registered Architects>Mei Katsuta
Kazuma Inoue
Usami Misako
Company Profile
- Company Name
- AR Architecture Office K.K.
- Address
- 2-5-29 Ueshio, Chuo-ku, Osaka, Japan
- Telephone
- +81-6-6765-0027
- Fax
- +81-6-6765-0028
- info@ar-design.biz
- Business Outline
- Architectural design & Construction supervision
- Registration
- First-class architectural firm registered with the Governor of Osaka Prefecture(ト)13834
- Company Representative
- Masayuki Shimokawa, President
- Managing Architect
- Masayuki Shimokawa
- Establisher
- Masayuki Shimokawa
- Number of Board of Directors
- 2
- Number of Employees
- 8
- Number of Engineers
- 2 Class-1 Registered Architects
2 Class-2 Registered Architects
1 CASBEE Evaluator
Media
- 2024
- Shinsaibashi Iwahashi Building was featured in "Using Wood Vol. 5: Wood Use Case Studies."。
- 2023
- Shinsaibashi Iwahashi Building was featured in "MACHINAMI 2023.11".
- 2023
- Shinsaibashi Iwahashi Building was featured in the Sankei Shimbun.
- 2023
- Shinsaibashi Iwahashi Building was featured in the Yomiuri Shimbun.
- 2023
- Shinsaibashi Iwahashi Building was featured in the Daily Wood Newspaper.
Flow
-
Consultation[free]
There are no cases where the completed appearance of the building is known from the beginning.
In our case, we sometimes consult with clients in situations where not only is it not clear what kind of building will be constructed, but also the site, what will be built, and even whether to build at all.
I think it is important to first have a dialogue, share an understanding, and then make it concrete. -
Field survey[free]
The characteristics of the site are a very important factor in architectural design.
We actually visit the site and gather the necessary information (in some cases, we may hire a professional surveying company for a fee)
and use this information as a guide for the architectural design. -
Research, planning and design*If the implementation has already been decided, it will be omitted.
If you find a plot of land you like but aren't sure whether you can build the structure you have in mind, we will make design proposals to help you make that judgment. -
Basic Design
While proposing a rough budget, we will decide on basic details such as the building's floor plan, exterior image, and concept.
This is a paid service, but since the scale of the building cannot be determined until the basic design is complete, we will enter into a design and supervision contract after the basic design is complete.
(If the work is suspended midway because the basic design is not completed, we will charge actual costs.) -
Detailed design
Based on the contents agreed upon in the basic design, we will create the drawings necessary for the actual construction.
We will request an estimate from the construction company based on the detailed design drawings, and the estimated amount submitted by the construction company will be the actual construction cost (*).
(※The amount when concluding a "construction contract" with the construction company)
In addition, we will simultaneously apply for various permits and licenses required for construction (development permit applications, building confirmation applications, etc.). -
Construction supervision work
This job involves checking whether construction is being carried out according to the drawings.
You will check and approve the construction drawings prepared by the construction company, check dimensions on-site, and attend inspections by various government agencies.
Budget
Since the volume of work varies depending on the content and scale of the building and the construction costs, we provide estimates for each project.
Until the basic design is completed, we estimate the design and supervision fees as a percentage of the construction cost(*) in the rough budget,
and provide a formal estimate before signing a contract, which you then sign upon agreement.